Trim & doors subcontractors

Trim and door takeoff for multifamily: door counts, casing and baseboard footage

Trim bids are won or lost on counts and footage. Vorbi reads the door schedule, counts doors by type, measures baseboard runs while leaving out non-scope areas and obstructions, and flags plan-versus-spec conflicts before your number goes out.

Available. This workflow runs in production every day at a commercial trim and cabinetry subcontractor.

  vorbi · trim & doors template
What gets measured
Door counts filtered by door type, straight from the door schedule
Baseboard and casing linear footage
Exclusions for non-scope areas (for example bathrooms) and obstructions (cabinets, appliances, door openings)
Runs under windows included correctly
Commercial and common areas measured without toilets and elevators
Takeoff

What Vorbi measures for trim & doors

  • Door counts filtered by door type, straight from the door schedule
  • Baseboard and casing linear footage
  • Exclusions for non-scope areas (for example bathrooms) and obstructions (cabinets, appliances, door openings)
  • Runs under windows included correctly
  • Commercial and common areas measured without toilets and elevators
  • Bids split by building for multi-building projects
Workflow

From drawings to installed

Send the drawings

Plans, door schedule and specs.

Review counts and footage

Doors by type and linear footage by unit type, floor and building.

Resolve conflicts

Mismatches between plans and specs are flagged, with GC questions ready to send.

Price and send

Your rates produce the bid sheet and a clean bid document.

Order and install

Orders by unit and floor, installer progress and punch lists.

Q&A

Trim & doors: quick answers

Can Vorbi count doors by type from a door schedule?

Yes. Vorbi reads the door schedule and counts doors filtered by type, so hardware and casing quantities follow the actual schedule rather than a manual tally.

How does baseboard footage handle cabinets and bathrooms?

Baseboard runs leave out non-scope areas such as bathrooms and obstructions such as cabinets, appliances and door openings, and correctly include runs under windows.

Can a multi-building bid be split by building?

Yes. GCs often award multi-building projects building by building, so Vorbi can split the bid and quantities per building.

See Vorbi on one of your trim & doors bids.

Tell us your trade and how you bid today. On a short discovery call we walk through your workflow and recommend the right way to work together.

Explore options for your company
  • Discovery call, no preparation needed
  • We map how you bid, buy and install
  • No obligation